HELICAL PIER INSTALLATION

Complete checklist for foundation helical pier installation.

PROJECT DETAILS

FEET

ESTIMATED REQUIREMENTS

Total Linear Feet:300 FT
Min Torque Required:6500 FT-LBS
Est. Install Time:5 HRS

BEFORE INSTALLATION

Obtain all required building permits and approvals

permits

Complete geotechnical soil investigation and analysis

soil

Review and approve pier design calculations

engineering

Verify pier specifications match load requirements

engineering

Mark all underground utilities (call 811)

utilities

Establish site access routes and staging areas

site

Verify equipment certifications and calibrations

equipment

Confirm pier materials meet specifications

materials

Review installation procedures with crew

crew

Establish benchmark elevations and control points

survey

Prepare safety equipment and protocols

safety

Schedule required inspections

inspection

DURING INSTALLATION

Verify pier locations match approved plans

layout

Install piers plumb within tolerance (1% max)

installation

Monitor and record installation torque continuously

monitoring

Achieve minimum torque requirements at bearing depth

torque

Document final installation depths for each pier

documentation

Verify pier spacing and alignment

layout

Install pile caps per specifications

caps

Complete load transfer connections

connections

Conduct load testing if required

testing

Document any field modifications

documentation

Complete final elevation survey

survey

Obtain inspection approvals

inspection

Submit as-built documentation

documentation

Clean and restore work areas

cleanup

PROGRESS

0 / 26 COMPLETED

COMPLETION

0%

PROFESSIONAL INSTALLATION TIPS

SOIL TESTING

Conduct thorough soil analysis before installation. Different soil types require different pier specifications and depths.

LOAD REQUIREMENTS

Ensure pier capacity meets or exceeds structural loads. Factor in both dead loads and live loads with appropriate safety margins.

TORQUE MONITORING

Continuously monitor installation torque. Torque-to-capacity correlations ensure proper load-bearing capacity is achieved.

DEPTH REQUIREMENTS

Piers must reach stable bearing stratum. Minimum depths vary by region and soil conditions - consult local codes.

QUALITY CONTROL

Document all installation parameters including depths, torques, and any deviations from plan. Maintain detailed records.

SAFETY PROTOCOLS

Follow all OSHA guidelines. Ensure proper shoring, fall protection, and equipment operation procedures are in place.